DEMONSTRATION ENVIRONMENT · SYNTHETIC DATAIllustrative facilities, forecasts & financial estimates · No operator affiliation
Asset Explorer
AHU · Z2 Central Utilities · Systemair

AHU AHU-108

0Health
P-fail 7d
16%
P-fail 30d
48%
P-fail 90d
66%
Modeled useful life 321 days

Discharge temp

92.3°C
simulated · 1.5s

Vibration RMS

5.6 mm/s
simulated · 1.5s

Motor current

126.9 A
simulated · 1.5s

Modeled financial impact

Repair cost
QAR 13.7K
Downtime
8 hrs
Downtime cost
QAR 57.1K
Risk-weighted 30d
QAR 34.0K

Synthetic signal stream · illustrative vibration threshold

Risk factors

  • Chloride deposition on coil fins — coastal salinity exposure
  • Condenser approach temperature exceeding design by 4.2°C
  • Seal leakage signature in acoustic profile
  • Oil analysis: elevated iron particulates (42 ppm)

Suggested maintenance actions

  1. 01Reduce load during 12:00–16:00 peak ambient window
  2. 02Inspect and replace mechanical seals
  3. 03Replace intake pre-filters and upgrade to F9 media