0Health
P-fail 7d
16%
P-fail 30d
48%
P-fail 90d
66%
Remaining useful life 321 days
Discharge temp
92.3°C
streaming · 1.5s
Vibration RMS
5.6 mm/s
streaming · 1.5s
Motor current
126.9 A
streaming · 1.5s
Financial impact
Repair cost
QAR 13.7K
Downtime
8 hrs
Downtime cost
QAR 57.1K
Risk-weighted 30d
QAR 34.0K
Risk factors
- Chloride deposition on coil fins — coastal salinity exposure
- Condenser approach temperature exceeding design by 4.2°C
- Seal leakage signature in acoustic profile
- Oil analysis: elevated iron particulates (42 ppm)
Recommended actions
- 01Reduce load during 12:00–16:00 peak ambient window
- 02Inspect and replace mechanical seals
- 03Replace intake pre-filters and upgrade to F9 media