MK
RL-07 · Command Center

Fleet Intelligence Overview

Live
Monitored assets
0
+12 onboarded this month
Fleet health index
0
−1.8 vs. prior 30d
Critical assets
0
3 new in 24h
30-day risk exposure
QAR 0
Top 25 assets
Downtime avoided YTD
QAR 0
+22% vs. 2025

Live facility twin · Ras Laffan Site 07

Open map →
Z1 · North Process Block
Z2 · Central Utilities
Z3 · Cooling Plant
Z4 · Substation & Power
Z5 · Gas Compression
Z6 · Coastal Intake
Healthy ≥75Watch 60–74Warning 40–59Critical <40

Priority alerts

All →
Z1 / PROCESS

North Process Block

INTAKESEPARATIONCOMPRESSIONEXPORTSCHEMATIC / NOT TO SCALE
Assets
50
Avg health
71
At risk
14
Z3 / THERMAL

Cooling Plant

CHILLERSDISTRIBUTIONLOADCOOLINGSCHEMATIC / NOT TO SCALE
Assets
54
Avg health
75
At risk
6
Z6 / COASTAL

Coastal Intake

INTAKEFILTRATIONPUMPSSUPPLYSCHEMATIC / NOT TO SCALE
Assets
47
Avg health
70
At risk
12

Projected failure exposure · 90d

Cumulative / model estimate
Critical healthWarning healthOther assets
Expected failures are summed asset probabilities, not confirmed events.

30-day risk exposure · by zone

QAR / expected cost
Probability-weighted repair and downtime cost for the monitored site.

Fleet health vs. ambient stress · 30d

Health by asset class

Highest 30-day failure probability

AssetClassZoneHealthP7P30P90GEIVibration 72hExposure
CT-106Cooling TowerZ6
21
21%72%80%75QAR 333.4K
CH-128ChillerZ6
19
29%71%81%80QAR 384.8K
P-126PumpZ1
22
21%70%82%67QAR 594.2K
M-151MotorZ3
22
26%68%78%74QAR 1.41M
C-104CompressorZ3
23
26%65%78%82QAR 822.9K
C-136CompressorZ2
25
17%65%73%56QAR 1.70M
M-130MotorZ2
24
24%61%78%69QAR 941.9K
CH-119ChillerZ1
30
23%59%73%63QAR 299.8K