0Health
P-fail 7d
17%
P-fail 30d
40%
P-fail 90d
66%
Modeled useful life 306 days
Discharge temp
89.6°C
simulated · 1.5s
Vibration RMS
5.6 mm/s
simulated · 1.5s
Motor current
128 A
simulated · 1.5s
Modeled financial impact
Repair cost
QAR 109.5K
Downtime
36 hrs
Downtime cost
QAR 251.9K
Risk-weighted 30d
QAR 144.6K
Synthetic signal stream · illustrative vibration threshold
Risk factors
- Motor current imbalance 6.8% across phases
- Insulation resistance degradation detected
- Chloride deposition on coil fins — coastal salinity exposure
- Airborne particulate loading on intake filters (PM10 > 410 µg/m³)
Suggested maintenance actions
- 01Rebalance motor phases and inspect terminations
- 02Inspect and replace mechanical seals
- 03Reduce load during 12:00–16:00 peak ambient window