0Health
P-fail 7d
17%
P-fail 30d
65%
P-fail 90d
73%
Remaining useful life 109 days
Discharge temp
92°C
streaming · 1.5s
Vibration RMS
5.7 mm/s
streaming · 1.5s
Motor current
124.3 A
streaming · 1.5s
Financial impact
Repair cost
QAR 121.3K
Downtime
94 hrs
Downtime cost
QAR 1.58M
Risk-weighted 30d
QAR 1.10M
Risk factors
- Seal leakage signature in acoustic profile
- Insulation resistance degradation detected
- Bearing vibration trending +38% over 14 days
- Motor current imbalance 6.8% across phases
Recommended actions
- 01Reduce load during 12:00–16:00 peak ambient window
- 02Apply sacrificial anode inspection on wetted parts
- 03Conduct thermographic survey of connections