0Health
P-fail 7d
23%
P-fail 30d
59%
P-fail 90d
73%
Modeled useful life 121 days
Discharge temp
90.9°C
simulated · 1.5s
Vibration RMS
5.7 mm/s
simulated · 1.5s
Motor current
129.7 A
simulated · 1.5s
Modeled financial impact
Repair cost
QAR 213.9K
Downtime
6 hrs
Downtime cost
QAR 85.9K
Risk-weighted 30d
QAR 176.9K
Synthetic signal stream · illustrative vibration threshold
Risk factors
- Bearing vibration trending +38% over 14 days
- Motor current imbalance 6.8% across phases
- Refrigerant suction pressure drift
- Insulation resistance degradation detected
Suggested maintenance actions
- 01Inspect and replace mechanical seals
- 02Apply sacrificial anode inspection on wetted parts
- 03Reduce load during 12:00–16:00 peak ambient window