Asset Explorer
Chiller · Z1 North Process Block · Daikin

Chiller CH-119

0Health
P-fail 7d
23%
P-fail 30d
59%
P-fail 90d
73%
Modeled useful life 121 days

Discharge temp

90.9°C
simulated · 1.5s

Vibration RMS

5.7 mm/s
simulated · 1.5s

Motor current

129.7 A
simulated · 1.5s

Modeled financial impact

Repair cost
QAR 213.9K
Downtime
6 hrs
Downtime cost
QAR 85.9K
Risk-weighted 30d
QAR 176.9K

Synthetic signal stream · illustrative vibration threshold

Risk factors

  • Bearing vibration trending +38% over 14 days
  • Motor current imbalance 6.8% across phases
  • Refrigerant suction pressure drift
  • Insulation resistance degradation detected

Suggested maintenance actions

  1. 01Inspect and replace mechanical seals
  2. 02Apply sacrificial anode inspection on wetted parts
  3. 03Reduce load during 12:00–16:00 peak ambient window