MK
Asset Explorer
Cooling Tower · Z6 Coastal Intake · BAC

Cooling Tower CT-103

0Health
P-fail 7d
15%
P-fail 30d
53%
P-fail 90d
65%
Remaining useful life 186 days

Discharge temp

91.7°C
streaming · 1.5s

Vibration RMS

5.2 mm/s
streaming · 1.5s

Motor current

127.7 A
streaming · 1.5s

Financial impact

Repair cost
QAR 77.6K
Downtime
60 hrs
Downtime cost
QAR 674.0K
Risk-weighted 30d
QAR 398.3K

Risk factors

  • Oil analysis: elevated iron particulates (42 ppm)
  • Seal leakage signature in acoustic profile
  • Motor current imbalance 6.8% across phases
  • Refrigerant suction pressure drift

Recommended actions

  1. 01Perform coil cleaning and anti-corrosion coating
  2. 02Recalibrate pressure transducers
  3. 03Conduct thermographic survey of connections