MK
Asset Explorer
Cooling Tower · Z5 Gas Compression · EVAPCO

Cooling Tower CT-124

0Health
P-fail 7d
21%
P-fail 30d
51%
P-fail 90d
70%
Remaining useful life 187 days

Discharge temp

91.8°C
streaming · 1.5s

Vibration RMS

5.6 mm/s
streaming · 1.5s

Motor current

125.2 A
streaming · 1.5s

Financial impact

Repair cost
QAR 36.3K
Downtime
34 hrs
Downtime cost
QAR 340.3K
Risk-weighted 30d
QAR 192.1K

Risk factors

  • Insulation resistance degradation detected
  • Chloride deposition on coil fins — coastal salinity exposure
  • Discharge temperature excursions during peak ambient (48°C)
  • Oil analysis: elevated iron particulates (42 ppm)

Recommended actions

  1. 01Conduct thermographic survey of connections
  2. 02Reduce load during 12:00–16:00 peak ambient window
  3. 03Recalibrate pressure transducers